A Saint through the shadows - St Pancras International on 28 Jan 2016

A Saint through the shadows – St Pancras International on 28 Jan 2016

A Saint through the shadows - St Pancras International on 28 Jan 2016

The station’s name comes from the St. Pancras neighbourhood, which originates from the fourth-century Christian boy martyr Pancras of Rome. The station was commissioned by the Midland Railway (MR), who had a network of routes in the Midlands, and in south and west Yorkshire and Lancashire but no route of its own to London. Before 1857 the MR used the lines of the L&NWR for trains into the capital; subsequently the company’s Leicester and Hitchin Railway gave access to London via the Great Northern Railway (GNR).

In 1862, traffic for the second International Exhibition suffered extensive delays over the stretch of line into London over the GNR’s track; the route into the city via the L&NWR was also at capacity, with coal trains causing the network at Rugby and elsewhere to reach effective gridlock. This was the stimulus for the MR to build its own line to London from Bedford, which would be just under 50 miles (80 km) long. Samuel Carter was solicitor for the parliamentary bill, which was sanctioned in 1863.

Design and construction

The interior of the Barlow Trainshed, circa 1870
The station was designed by William Henry Barlow and constructed on a site that had previously been a slum called Agar Town. Though coal and goods were the main motivation to build the station, the Midland realised the prestige of having a central London terminus and decided it must have a front on Euston Road. The company purchased the eastern section of land on the road’s north side owned by Earl Somers.

The approaching line to the station crossed the Regent’s Canal at height allowing the line reasonable gradients; this resulted in the level of the line at St Pancras being 20 ft (6.1 m) above the ground level. Initial plans were for a two or three span roof with the void between station and ground level filled with spoil from tunnelling to join the Midland Main Line to the St. Pancras branch. Instead, due to the value of the land in such a location the lower area was used for freight, in particular beer from Burton. As a result, the undercroft was built with columns and girders, maximising space, set out to the same plans as those used for beer warehouses, and with a basic unit of length that of a beer barrel.

The contract for the construction of the station substructure and connecting lines was given to Messrs. Waring, with Barlow’s assistant Campion as supervisor. The lower floor for beer warehousing contained interior columns 15 ft (4.57 m) wide, and 48 ft (14.63 m) deep carrying girders supporting the main station and track. The connection to the Widened Lines (St. Pancras branch) ran below the station’s bottom level, in an east-to-west direction.

To avoid the foundations of the roof interfering with the space beneath, and to simplify the design, and minimise cost, it was decided to construct a single span roof, with cross ties for the arch at the station level. The arch was sprung directly from the station level, with no piers. Additional advice on the design of the roof was given to Barlow by Rowland Mason Ordish. The arches’ ribs had a web depth of 6 ft (1.8 m), mostly open ironwork. The span width, from wall to wall was 245 ft 6 in (74.83 m), with a rib every 29 ft 4 in (8.94 m) The arch was a slightly pointed design, with a reduced radius of curvature at the springing points. The Butterley Company was contracted to construct the arches. The total cost of the 24 rib roof and glazing was over £53,000, of which over half was for the main ribs. The cost of the gable end was a further £8,500.

The clock tower of St Pancras:
The single-span overall roof was the largest such structure in the world at the time of its completion. The materials used were wrought iron framework of lattice design, with glass covering the middle half and timber (inside)/slate (outside) covering the outer quarters. The two end screens were glazed in a vertical rectangular grid pattern with decorative timber cladding around the edge and wrought iron finials around the outer edge. It was 689 feet (210.01 m) long, 240 feet (73.15 m) wide, and 100 feet (30.48 m) high at the apex above the tracks. At the time of opening, it was the world’s largest unsupported station roof.

Local services began running to the Metropolitan Railway junction underneath the terminus on 13 July 1868. The station itself opened to the public on 1 October. The first service was an overnight mail train from Leeds.

Early services
St Pancras was built during a period of expansion for the MR, as the major routes to Manchester, Nottingham, Sheffield and Carlisle opened during this time. By 1902, there were 150 trains arriving and leaving the station daily, though this figure was far less than Waterloo or Liverpool Street. As well as Midland services, the Great Eastern Railway (GER) used St Pancras as a "West End" terminus for trains to Great Yarmouth, Norwich, Lowestoft between 1870 and 1917. At the turn of the 20th century, St Pancras also had a faster service to Cambridge than King’s Cross, at 71 minutes. GER services were suspended because of World War I and never resumed.

The London, Tilbury and Southend Railway (LTSR) began offering boat train services from St Pancras from 9 July 1894, following the opening of the Tottenham and Forest Gate Railway. The trains ran from St Pancras to Tilbury via South Tottenham and Barking. Tilbury Docks then provided a connection to Australia and Scandinavia. The following year, the LTSR began a service from St Pancras to Southend Central. Boat trains continued to run from St Pancras until 1963, after which they were moved to Liverpool Street and Fenchurch Street.

Grouping, nationalisation and privatisation

The station was damaged by a bomb in May 1941 during the Blitz.
The Railways Act of 1921 forced the merger of the Midland with the London and North Western Railway (L&NWR) into the London, Midland and Scottish Railway (LMS), and the LMS adopted the LNWR’s (the "Premier Line") Euston station as its principal London terminus. The Midland Grand Hotel was closed in 1935, and the building was subsequently used as offices for British Railways. During World War II, bombing inflicted damage on the train shed, which was only partially reglazed after the war. On the night of 10–11 May 1941 a bomb fell onto the station floor at platform 3, exploding in the beer vaults underneath. The station was not significantly damaged, but was closed for eight days, with platforms 2–3 remaining closed until June. In 1947 the St. Pancras junction was relaid with prefabricated trackwork, along with associated changes to the signalling system.

On the creation of British Railways (BR) in 1948, St Pancras received a significant investment after neglect by the LMS. Destinations included the London area services to North Woolwich, St Albans and Bedford. Long-distance trains reached Glasgow, Leeds, Nottingham, Sheffield and Manchester, with famous named trains including The Palatine to Manchester, The Thames-Clyde Express to Glasgow, and The Master Cutler to Sheffield (transferred from King’s Cross in 1966, which itself had transferred from Marylebone eight years earlier).

On 7 October 1957, the signalling at St Pancras was upgraded, replacing the three original boxes with a power box controlling 205 route switches and 33 points over a network of 1,400 relays. From 1960 to 1966, electrification work on the West Coast Main Line between London and Manchester saw a new Midland Pullman from Manchester to St Pancras. These trains and those to Glasgow were withdrawn following the completion of the rebuilding of Euston and the consolidation of these services.

By the 1960s, St Pancras was seen as redundant, and several attempts were made to close it and demolish the hotel (by then known as St Pancras Chambers). These attempts provoked strong and successful opposition, with the campaign led by the later Poet Laureate, John Betjeman. Jane Hughes Fawcett with the Victorian Society was instrumental in its preservation, and was dubbed "the furious Mrs. Fawcett" by British rail officials. Many of the demonstrators had witnessed the demolition of the nearby Euston Arch a few years previously, and were strongly opposed to the distinctive architecture of St Pancras suffering the same fate. The station became Grade I listed building in November 1967, preventing any drastic modifications. The plans were scrapped by BR in December 1968, realising that it was more cost-effective to modernise the hotel instead, though they disliked owning it.

In the 1970s, the train shed roof was in danger of collapse, and the newly appointed Director of Environment Bernard Kaukas persuaded the company to invest £3m to save it. In 1978, a Private Eye piece said that British Rail really wanted to demolish St Pancras but were opposed by "a lot of long-haired sentimentalists" and "faceless bureaucrats" and praised the office blocks that replaced the Euston Arch.

After the sectorisation of British Rail in 1986, main-line services to the East Midlands were provided by the InterCity sector, with suburban services to St Albans, Luton and Bedford by Network SouthEast. In 1988 the Snow Hill tunnel re-opened resulting in the creation of the Thameslink route and the resultant diversion of the majority of suburban trains to the new route. The station continued to be served by trains running on the Midland main line to Leicester, Nottingham and Sheffield, together with a few suburban services to Bedford and Luton. These constituted only a few trains an hour and left the station underused.

Following the privatisation of British Rail, the long-distance services from St Pancras were franchised to Midland Mainline, a train operating company owned by National Express, starting on 28 April 1996. The few remaining suburban trains still operating into St Pancras were operated by the Thameslink train operating company, owned by Govia, from 2 March 1997.

A small number of trains to and from Leeds were introduced, mainly because the High Speed Train sets were maintained there and were already running empty north of Sheffield. During the 2000s major rebuild of the West Coast Main Line, St Pancras again temporarily hosted direct and regular inter-city trains to Manchester, this time via the Hope Valley route (via the Dore South curve) under the title of Project Rio.

New role

Model of the extended St Pancras station (left) and King’s Cross station (right, seen before restoration circa 2012)
The original plan for the Channel Tunnel Rail Link (CTRL) involved a tunnel from south-east of London to an underground terminus in the vicinity of King’s Cross. However, a late change of plan, principally driven by the then Secretary of State for the Environment Michael Heseltine’s desire for urban regeneration in east London, led to a change of route, with the new line approaching London from the east. This opened the possibility of reusing St Pancras as the terminus, with access via the North London Line, which crosses the throat of the station.

The idea of using the North London line was rejected in 1994 by the transport secretary, John MacGregor, as "difficult to construct and environmentally damaging". However, the idea of using St Pancras station as the terminus was retained, albeit now linked by 12.4 miles (20 km) of new tunnels to Dagenham via Stratford.

London and Continental Railways (LCR), created at the time of British Rail privatisation, was selected by the government in 1996 to reconstruct St Pancras, build the CTRL, and take over the British share of the Eurostar operation. LCR had owned St Pancras station since privatisation to allow the station to be redeveloped. Financial difficulties in 1998, and the collapse of Railtrack in 2001, caused some revision of this plan, but LCR retained ownership of the station.

The design and project management of reconstruction was undertaken on behalf of LCR by Rail Link Engineering (RLE), a consortium of Bechtel, Arup, Systra and Halcrow. The original reference design for the station was by Nick Derbyshire, former head of British Rail’s in-house architecture team. The master plan of the complex was by Foster and Partners, and the lead architect of the reconstruction was Alistair Lansley, a former colleague of Nick Derbyshire recruited by RLE.

To accommodate 300-metre+ Eurostar trains, and to provide capacity for the existing trains to the Midlands and the new Kent services on the high-speed rail link, the train shed was extended a considerable distance northwards by a new flat-roofed shed. The station was initially planned to have 13 platforms under this extended train shed. East Midlands services would use the western platforms, Eurostar services the middle platforms, and Kent services the eastern platforms. The Eurostar platforms and one of the Midland platforms would extend back into the Barlow train shed. Access to Eurostar for departing passengers would be via a departure suite on the west of the station, and then to the platforms by a bridge above the tracks within the historic train shed. Arriving Eurostar passengers would leave the station by a new concourse at its north end.

This original design was later modified, with access to the Eurostar platforms from below, using the station undercroft and allowing the deletion of the visually intrusive bridge. By dropping the extension of any of the Midland platforms into the train shed, space was freed up to allow wells to be constructed in the station floor, which provided daylight and access to the undercroft.

The reconstruction of the station was recorded in the BBC Television documentary series The Eight Hundred Million Pound Railway Station broadcast as six 30-minute episodes between 13‒28 November 2007.

Rebuilding

The Meeting Place and the Olympic Rings for the 2012 Summer Olympics
By early 2004, the eastern side of the extended train shed was complete, and the Barlow train shed was closed to trains. From 12 April 2004, Midland Mainline trains terminated at an interim station occupying the eastern part of the extension immediately adjacent to the entrance.

As part of the construction of the western side of the new train shed that now began, an underground "box" was constructed to house new platforms for Thameslink, which at this point ran partially under the extended station. In order for this to happen, the existing Thameslink tunnels between Kentish Town and King’s Cross Thameslink were closed between 11 September 2004 and 15 May 2005 while the works were carried out. Thameslink services from the north terminated in the same platforms as the Midland Main Line trains, while services from the south terminated at King’s Cross Thameslink.

When the lines were re-opened, the new station box was still only a bare concrete shell and could not take passengers. Thameslink trains reverted to their previous route but ran through the station box without stopping. The budget for the Channel Tunnel Rail Link works did not include work on the fitting out of the station, as these works had originally been part of the separate Thameslink 2000 works programme. Despite lobbying by rail operators who wished to see the station open at the same time as St Pancras International, the Government failed to provide additional funding to allow the fit out works to be completed immediately following the line blockade. Eventually, on 8 February 2006, Alistair Darling, the Secretary of State for Transport, announced £50 million funding for the fit-out of the station, plus another £10–15 million for the installation of associated signalling and other lineside works.

The fit-out works were designed by Chapman Taylor and Arup (Eurostar) and completed by ISG Interior Plc Contractors collaborating with Bechtel as Project Managers. The client was London and Continental Railways who were advised by Hitachi Consulting.

In 2005, planning consent was granted for a refurbishment of the former Midland Grand Hotel building, with plans to refurbish and extend it as a hotel and apartment block. The newly refurbished hotel opened to guests on 21 March 2011 with a grand opening ceremony on 5 May.

By the middle of 2006, the western side of the train shed extension was completed. The rebuilding cost was in the region of £800 million, up from an initial estimate of £310 million.

The International station
In early November 2007, Eurostar conducted a testing programme in which some 6000 members of the public were involved in passenger check-in, immigration control and departure trials, during which the "passengers" each made three return journeys out of St Pancras to the entrance to the London tunnel. On 4 September 2007, the first test train ran from Paris Gare du Nord to St Pancras. Children’s illustrator Quentin Blake was commissioned to provide a huge mural of an "imaginary welcoming committee" as a disguise for one of the remaining ramshackle Stanley Building South immediately opposite the station exit.

St Pancras was officially re-opened as St Pancras International, and the High Speed 1 service was launched on 6 November 2007 by Queen Elizabeth II and the Duke of Edinburgh. Services were extended to Rotterdam and Amsterdam in April 2018.

During an elaborate opening ceremony, actor Timothy West, as Henry Barlow, addressed the audience, which was also entertained by the Royal Philharmonic Orchestra and the singers Lemar and Katherine Jenkins. In a carefully staged set piece, the first Class 395 train and two Class 373 trains arrived through a cloud of dry ice in adjacent platforms within seconds of each other. During the ceremony, Paul Day’s large bronze statue The Meeting Place was also unveiled. At a much smaller ceremony on 12 November 2007, the bronze statue of John Betjeman by sculptor Martin Jennings was unveiled by Betjeman’s daughter, the author Candida Lycett Green. Public service by Eurostar train via High Speed 1 started on 14 November 2007. In a small ceremony, station staff cut a ribbon leading to the Eurostar platforms. In the same month, services to the East Midlands were transferred to a new franchisee, East Midlands Trains. The low-level Thameslink platforms opened on 9 December 2007, replacing King’s Cross Thameslink.

St Pancras has retained a reputation of having one of the most recognisable facades of all the London termini, and is known as the "cathedral of the railways". In Britain’s 100 Best Railway Stations by Simon Jenkins, the station was one of only ten to be awarded five stars. The station has bilingual signs in French and English, one of the few in England to do so.

Services:
St Pancras contains four groups of platforms on two levels, accessed via the main concourse at ground level. The below-surface group contains through platforms A and B, and the upper level has three groups of terminal platforms: domestic platforms 1–4 and 11–13 on each side of international platforms 5–10. Platforms A & B serve Thameslink, 1–4 connect to the Midland Main Line, while platforms 11–13 lead to High Speed 1; there is no connection between the two lines, except for a maintenance siding outside the station. There are also a variety of shops and restaurants within the station concourse.

The station is the London terminus for Eurostar’s high-speed trains to Paris, Brussels, Amsterdam and Lille via the Channel Tunnel. It is also the terminus for East Midlands services from London to Derby, Leicester, Nottingham, Sheffield, and smaller towns en route. Thameslink trains on the cross-London Thameslink route call at platforms beneath the main station, south to Gatwick Airport and Brighton and north to Luton Airport Parkway for Luton Airport and Bedford. High-speed domestic services to Kent, run by Southeastern, depart on the same level as Eurostar & East Midlands Trains.

The terminal is one of relatively few railway stations in England to feature multilingual signage in English and French. In March 2014, the station’s public relations team commissioned a study of mispronounced words, reportedly as a result of passengers referring to the station as "St Pancreas".